- Arts & Culture 5954
- Business & Economics 689
- Computers 317
- Dictionaries & Encyclopedias 81
- Education & Science 74941
- Abstracts 252
- Astrology 4
- Astronomy 1
- Biology 8
- Chemistry 2513
- Coursework 15782
- Culture 9
- Diplomas 411
- Drawings 571
- Ecology 6
- Economy 82
- English 78
- Ethics, Aesthetics 3
- For Education Students 17626
- Foreign Languages 11
- Geography 3
- Geology 1
- History 89
- Maps & Atlases 5
- Mathematics 12325
- Musical Literature 2
- Pedagogics 19
- Philosophy 23
- Physics 14904
- Political Science 5
- Practical Work 101
- Psychology 60
- Religion 4
- Russian and culture of speech 8
- School Textbooks 7
- Sexology 42
- Sociology 9
- Summaries, Cribs 87
- Test Answers 151
- Tests 9245
- Textbooks for Colleges and Universities 32
- Theses 24
- To Help Graduate Students 14
- To Help the Entrant 37
- Vetting 364
- Works 13
- Информатика 10
- Engineering 3060
- Fiction 696
- House, Family & Entertainment 107
- Law 132
- Website Promotion 71
14-ти этажный кирпичный жилой дом
Uploaded: 17.01.2013
Content: 1412641.pdf 72,01 kB
Product description
\u003cb\u003eDiploma Project: 14-storey brick house with an extended plan first floor - under construction in the city of Nizhny Novgorod.\u003c/b\u003e
The architectural and construction parts were developed:
graphic particles axonometry, facades, the master plan, floor plans, sections, as well as plans for floors and coverings;
in the explanatory note described all the design features of the building, sanitary engineering, engineering equipment, volumetric-planning and artistic solutions.
In the settlement and constructive part of the structural design options are shown: two versions of the foundation and pillars of which is a result of technical and economic comparisons were chosen the most economical.
The technological and organizational units were reviewed work on the construction of above-ground parts of the project, developed technological cards for the main types of construction works. Works on organization of building production. Made line method of work.
In the economic part of the costs have been calculated on the entire volume of the building.
Under the protection of the environment the methods of safe working conditions, as well as measures to minimize environmental pollution.
- Graphic material is presented in a format COMPASS 12.
- Text material in the format of Word doc.
\u003cb\u003eThe content of the archive:\u003c/b\u003e
1) Free part:
- Demonstration of sheets of drawings in compressed form as bitmaps with a water mark of 1024 * 724;
- The introduction and justification of the explanatory note + BONUS - Plan performance while protecting the diploma;
2) Access by \u003cem\u003epassword (contained in a file obtained after payment):\u003c/em\u003e
- The graphical part of the 10 sheets A1 format COMPASS 12;
- The text part - explanatory note.
Additional information
\u003cb\u003eThe contents of the text part\u003c/b\u003e
Abstract
Justification of the chosen theme
1. Architecture and construction of the
2. settlement and constructive part
3. The technological part
4. The construction industry
5. The economic part
6. Environmental protection
References
\u003cb\u003eThe content of the graphic part\u003c/b\u003e
1. Perspective;
2. Facades, situational scheme, master plan, TEP, the explication of the general plan;
3. The floor plan layout floor slabs, roofing scheme, layout of rafters,
4. Sections 1-1, 2-2,3-3, units;
5. Plan foundations, geotechnical incision sites;
6. Plan of overlap; Reinforcement plate P2; Reinforcing bolts, reinforcement partition, sectional specification;
7. Technological scheme of the works of a zero cycle, cuts, schedule of works of a zero cycle, units;
8. Technological scheme of the construction of buildings, sites, schedule of works, units;
9. stroygenplana, legend stroygenplana, TEP;
10. The schedule of works, movement of labor, income and consumption of materials, work arrangements.
You can \u003ca href=\
Feedback
0Period | |||
1 month | 3 months | 12 months | |
0 | 0 | 0 | |
0 | 0 | 0 |